What is assignable cause in Control Chart?

Sun Apr 26, 2020 2:25 am

A control chart consists of upper and lower limits that indicates the threshold at which the process output is considered statistically unlikely and are drawn typically at 3 standard errors from the center line. An assignable cause in control chart indicates

1. The equipment is becoming obsolete
2. More training is required
3. There is a variation and needs intervention
4. Schedule would be affected
Explore our online PMP Program , it makes PMP Easy :-) http://goo.gl/ZmD3xF

Image Image Image Image
Viswanathan Raju
Posts: 11
Joined: Sat Nov 02, 2019 6:17 am

Re: What is assignable cause in Control Chart?

Fri May 29, 2020 12:01 pm

3. There is a variation and needs intervention.
Is this is the correct answer...?